Time to start expanding the solar panel frames for more panels.
With the 12 more panels ordered and arriving soon, We need a place to mount them when they get here.
And since the holes are dug and poles secure, it’s time to start working on the frames.
First up is attaching the 4 ft cross beams to the poles so I can mount the 10 ft board.
It’s not too hard on the new poles, but since I’m sharing the center pole, I have to tie into the current frame without losing the panels currently mounted on it.
I have a plan in mind on how it will work, but until I do it, I’m not 100% sure it will work.