2 walls down! Shiplap going up quick.

2 walls down! The shiplap is going up quick. Quicker than expected, and I’m not complaining one bit!

After almost a weeks worth of working during the evenings, The first wall is almost complete.
So, time to get that finished up and start the shiplap on the second large wall.

I did dig the trench from the cabin to the shed for the electric, and what took all of Friday evening to get accomplished. Getting through the tree roots was difficult.

However, with the electric to the breaker box, that means the shiplap can go up over it!